skip to main content
STEM project for Mrs. Raines 2nd grade class
Posted On:
Thursday, November 17, 2016
News Image
Students use STEM project to build a Pilgrim's Protection Shelter- Way Cool!

The students had to design a pilgrim shelter using the following criteria and constraints.  Shelter must be large enough to contain one or more Pilgrims (3 inches tall), shelter must have a way for the Pilgrim to enter and exit, and shelter must protects the Pilgrim(s) from wind, rain, and snow.  Students can only use the materials provided and the structure must stand alone. 

View all Highlights
Helpful resources all in one place: georgiasummer.org Woodstation Dance Team 2018-2019 Kindergarten Welcome to Woodstation Night- May 8th from 5:00 to 7:15 p.m. Pre-K Welcome to Woodstation Night May 8th from 5:00 to 7:15 p.m. Track team 2018 at LFO Meet PBIS Spreading the Seeds of Kindness